7-81                          Financial Status:

                                                Offertory envelopes - $2525   Building Fund - $10,055

                                                Total Working Fund - $74,224   Check Balance - $5472

                                                Church:   Priest Salary -   $300   Lay Salary - $50 Rent Methodist -$100

                                                Rectory: Lay salaries - $222   Food - $171  

                                                Education: - $204 Fixed Expense - $354 Total Operating Exp. $12,234

 

7-28-81                    Debbie Carleo volunteered to chair the rummage sale in conjunction with Wesley United Methodist Church Profits to be split 50-50.   Our Lady of the Meadow’s portion to go to the Building Fund.

                                Meeting of   Fr. Schmitt and Ray Moroney with Jim Gardner, architect of Hurtig, Gardner and Froelich, resulted in the following:

                                     Interior:

                                                Leave capacity at 400, cry room 25

                                                Church to contain 6,125 sq.ft. with a 6,125 sq.ft. basement

                                                Exit doors - 1 each side with wall curvature @ $4000 each using brick and $600 for both using wood. Board decision: Put niches in previous location, leave doors open (exposed) and forget the curved walls.

                                                Have straight step - O.K.

                                                Ceiling in church to be 16 ft. O.K. Over altar add 1 foot for $2-3000 more. Space behind beams adequate to hide altar lights.   Decided to leave sanctuary ceiling same as rest of the church

                                                Windows - louvered, to crank out, to match front windows, use two each side with strip of brick between

                                                Offices- decided to leave all the same except the sacristy which will be 9ft x 11 ft, reconciliation room 7ft x 11 ft.

                                                Windows in offices and cry room to be at bottom and crank out

                                                Ventilation system throughout with exhaust in bathrooms

                                                Fire extinquishers- architect to check requirements and make as inconspicuous as possible

                                                Cornerstone-donated by architect and builder. To include the name, date and box for information - leave to the architect

                                                Entry way - vinyl, asbestos, tile, terrazzo, slate, Italian marble   (12ft x 16ft)- come back with bids

                                                Carpet under pews - get price differences

                                                Air lock doors - no problem to do later

                                                Portable baptismal font   O.K.

                                                Ceiling over altar - same backdrop as beams   O.K.

                                                Duct work over the ceiling O.K.

                                                Eliminate skylights- use spotlights instead

                                                Five 20ft. beams over the aisles- bottom and sides solid- joint where beams join ceiling 12ft x 16ft have 1 inch joint molding

                                                Wood behind sanctuary (27ft) should be same color   O.K. $5000 to panel, leave brick and add later

                                                Speakers will probably all be in the ceiling

                                     Exterior:

                                                Walls 15 ft and   1 ft insulation O.K.

                                                Center and glass above front entrance to be clear or slightly tinted with statue of Our Lady facing out with spotlight behind and planter

                                                Wood under roof - decide color later

                                                Ramp   O.K.

                                                Block/brick ? decide after bids in

                                     Basement:

                                                Pillars to be moved to outside walls, pre-stressed concrete 24 inches plus, strip lighting

                                                RE coordinator’s office 12ftx18ft- eliminate door to the storage area , square off wall next to storage are and use double door entrance into large room . Enter furnace room through storage room

                                                Kitchen 28 1/2ft by 12ft with counter into large room and back counter with cabinets underneath   O.K.

                                                Bathrooms - 1 sink, 1 shower ($600 ea), 2 stools in women’s, 1 stool in men’s

                                                Storage room   16ftx10ft will accommodate tables, entrance into large room and entrance to furnace room

                                                Knock-out walls, decided these will not be necessary

                                Architect’s fees will be $20,000 total, first installment $12,000

                                Fr. Schmitt reported:

                                                Joe Beltramo will contact architect, Jim Gardner, about digging big hole as a donation, should be under construction by October and in church by Easter

                                                After church is built some leveling and landscaping will be donated

                                                Don Musso will donate landscaping or part of it

                                                Bid blacktop ( 93 parking spaces) and concrete later separately

                                                Donations continue from churches and some lodges

                                                Lorraine Pirc has Craft show underway- church to have pie and ice cream booth

                                                Out of 250 sets of envelopes only six left - to order 400 next year

                                                Fr. Schmitt presented Rev Tapia of Wesley United Methodist Church a clerical shirt and collar

                                                To get extra catalogues from church goods house for everyone to see and to decide on one design to follow so that all donations will be uniform Pictures to be displayed of those items needed. “Donated by” plaques will be placed on the items.

 

Aug. 14, 1981                         1980 taxes on parish house $955.98 - Our Lady of the Meadows responsible for 30% and the Diocese for 70%

                                                Nine bricks sold at Holy Family booth - $180.00

                                                Building Fund update:   Mt. Carmel $57,000; Dain Bosworth 17,224; Checking $1000 = $75224. Extension Society will give maximum amount of $50,000 when roof is on structure for a total of $125,224.

                                                Refine church sketch:

                                     Interior:

                                                Move niches to edge of altar - door both sides of curved wall holding statues

                                                Louvered windows to crank at bottom and be frosted- windows in cry room and offices should not open

                                                Offices: Sacristy   8’x11’; secretary’s office 12’x 11’; lavatory 5’x4’;

                                                Storage 4’ and hall 3’; Pastor’s office 13 1/2’ x 11’; reconciliation room 8’x11’ or 2 rooms 8’ x 5 1/2’

                                                Entry way floor should have no grouting

                                                Wood behind altar need not match beams, may be better if different

                                                Leave the speaker locations to professionals

                                                Aisles -center 6’;side 4’; front depth 12’; side front depth 8’

                                                Altar step 11 1/2” or 11 3/4 “ deep

                                     Basement:

                                                Nine foot ceiling

                                                Move kitchen to outside corner, 28 1/2’x12’ and extend counter into room side (oversize) and have a back counter

                                                Bathrooms each to have 1 shower, 1 sink and 2 stools

                                                Storage room to be 14’x’9’

                                      Exterior:

                                                Ramp = 1” for every foot

                                                Rest remained the same.

                                Mr. Ray Moroney requested that the present Advisory Board be kept intact until the church is built- terms expire 5-82

                                Wesley United Methodist Church and Our Lady of the Meadows to again share the Craft Carnival and Buffet Dinner - our portion to go to the Building fund

                                Diocesan Workroom to be self-supporting- consider purchasing own copier

                                Projected income for fiscal year now $32,800 - parishes and clergy still giving to Building Fund

 

9-15-81                    RE: Mary Schaeffer back.   97 families registered 161 children with 25 teachers and aides (14 new). All classes have teachers ( 1 temporary). Six OLM represented at the teaching workshop.

                                Building Fund to have a separate budget, need to increase income for the Building Fund. Committee budgets to be itemized next year.

                                Youth Committee will coordinate with RE with session 9-12 on three nights a week and one night of fun to which anyone can come

                                Marlene Johnson and Debbie Carleo investigating the formation of a women’s group

                                OLM workers stayed the full time at the Rummage Sale and shared $281. Leftover clothes given to Church of Christ Disaster Fund and books to the Friends of the Library

                                Fr. Schmitt and Ray Moroney met with Architect Mr. Jim Gardner. All changes incorporated.   Changes to go through Fr. Schmitt or Ray Moroney. Suggestions must go through the Board.

                           Approved transcript agreement from Mr. John Venezia that stock held on front portion is to be exchanged for land if   lease agreement is signed on back portion for 10 years/$100/yr with option to buy in 10 years for $50,000. Land will accommodate church, parking for 130-140 cars plus room for another building. No access to Red Creek Springs Road

                                Blueprints ready for bid in October, groundbreaking in November, in by Easter

                                Extension Society requires picture of the structure with the roof on within one year - 7-8-82

                                Parish fee paid for Diocesan RE Congress at Holy Family.

                                Fr. Louis Stovik at the Shrine will do photocopying for minimum cost if supply own paper

                                Immaculate Conception Lodge #104 donated $434 for purchase of office equipment - desk and chair

                                Pledges very good, most for one year, some for 2-3 yrs. Judy Stefano continues to record the pledges.

                                260 families now registered

 

10-13-81 RE - 110 families with 180 students registered, need to add 3rd second grade class

                                OLM reserved a table for $15 at the Alpha Mu Delta annual Christmas Tree Extravaganza at the Scottish Rite Temple. OLM also responsible for a decorated tree and craft items

                                Finance Committee recommended decreasing deposits to Mt. Carmel Credit Union and increasing deposits to Dain Bosworth to keep money more available. May need to borrow $3645 from the building fund to make house payment Nov. 10

                                Diocesan Business Manager verified the John Venezia donation of land forthe church structure now and the back land bordering Red Creek Springs Road later

                                In meeting with Mr. Jim Gardner, he made the following change recommendations:

                                                Entrance should be 1 foot wider on each side

                                                Move the beams over the pews instead of over the aisles

                                                Offices and cry room have been reversed because of the slope of the land to allow for the ramp

                                                Basement ceiling to be 8 1/2 ft as needed for drainage

                                                Niches have pedestals with statues partially into the wall

                                                Windows to be arched with brick or block

                                                Roofline will be similar to the cardboard model with the crucifix in the center

                                                Furnace and air conditioner will be moved to opposite ( back) wall and condensers and meters will be on the back Storage area unchanged.

                                                Kitchen planned so everything will fit

                                                There will be 6000sq ft both up and down

                                Future ideas for approach to Building Fund:

                                                Car raffle

                                                Las Vegas Weekend Trip

                                                Las Vegas Night in own facility

                                                Raffle a trip or liquor, or a play house

                                                Candy sales -- too much overhead

                                                Sell recipe books

                                                Provide parishioners with update on Building Fund, one year pledges being paid off - need repledging or extending

                                Youth and RE Committees need very close coordination. Madeline Santos offered to work with interested youth to prepare a music group for Christmas Mass

                                Beginning Sunday, Liturgy changes include having all announcements printed out and read by commentators at beginning of Mass, in future will eliminate commentators and have two lectors instead. Lectors to sit with families and come to the altar, Psalms to be sung five times a year and the song leader will recite the verse, more quiet time allotted for reflection

                                Some changes will occur in the interior appointments of the church

 

11-10-81 RE family gatherings for Advent :                

                                                The Jesse Tree

                                                Prayer Service and Social

                                                Advent Party for Kindergarden through 5th grade

                                                5th grade to present a play , caroling to follow

                                Finance Committee reported a parishioner donated a TRS 80 computer which with modifications could replace a copier

                                Architect to send out bids

                                Committee for Women’s Group needed co-leaders to work with designated boundary lines and each area group to decide own meeting times and frequencies. Groups to assist in Church activities, progress and needs

                                To survey frontage of church property- may need culvert

                                Need roof over patio of parish house

                                Fr. Schmitt met with grant-writing expert Dr. Hartment at Mt. St. Scholastica’s. She provided input and draft written for requests to be sent out soon

                                $98,000 collected from pledges

                                Six adults and 2 children in Catecumen Program

 

12-10-81 Ready to order cement, lime and bricks

 

12-15-81 Finance Committee reported $11,000 taken from Mt. Carmel Credit Union and put in Dain Bosworth = $99,800 with $1000 in checking = $100,000+

                                Realized $249 from Christmas Tree Extravaganza- sold most craft items

                                Fr. Powers Basketball League has 11 kids in 5-6-7- grades, $20 fee donated, $75 entrance fee and uniforms donated. Parish cost $30-50. C. T. Fitzgerald coach.

                                Debbie Carleo, co-chair Bob Miller and John Skerjanec for Las Vegas raffle trip on a Sunday through Thursday.   Bought 600 books (12000 tickets) for $139.

                                Voted to raise secretaries salary from $3.35/hr to $4/hr beginning with first pay in January, to increase hours for a few weeks to type grant letters, to be given $25 Christmas bonus

                                Complied with Diocesan requested questionnaire completed by Board members listing 5-10 priorities of the Diocese

                                Interior Planning Committee: Lorraine Pirc, Madeline Santos, Louise Sherrer, Rose Speiss, Chris Pannunzio members, with Ray Moroney and Fr. Schmitt ex-officio.

                                Decided not to contribute the Wesley United Methodist Church’s remodeling of sanctuary at this time. Give $100 toward Christmas decorations

                                Contractor Bids:  

                                                Whitlock     $417,700     180 days    (less $18,000)

                                                Acorn            392,000     190           (less $12,000)

                                                Bassett         383,700     180            (less $15,150) Selected

                                                Brick inside and out, carpet in the aisles

                                                Outside finished except sidewalk

                                Possible areas to cut:

                                                Performance bond        $3180

                                                                Window wells                    225

                                                                Soldier brickwork                    350

                                                                Beams to dry wall          3500